Realisatie

DSV Solutions.

Puurs

2024

Design and installation of a new heat network in the warehouse, heat sink system, electrical main panels, BMS and integration of the existing office radiators and hot water production.

The system

The low GWP (1) and ODP (0) refrigerant, R744, used in the heat pump was a clear choice in line with their long-term vision. 1.5MW of thermal capacity is installed for the warehouse and offices combined. Mozaïek Engineering designed and installed a new heat network in the warehouse, heat sink system, electrical main panels, BMS and integration of the existing office radiators and hot water production.

DSV Solutions
DSV Solutions
DSV Solutions
DSV Solutions
DSV Solutions
DSV Solutions

In het kort

COP (full system)

3.5

Heat Capacity

1.5MW

Heat Sink

Supply temperature 60-80°C Return temperature 30-32°C

Heat Source

Air Source 4x Güntner flatbed evaporators

Kantoor

300kW CO2 Chiller